| Small Hydro Projects |
|
|
| (a) Taraila SHP (5MW) |
View Records |
Taraila SHP was the first venture setup by GGPL. It has a capacity of 5MW and started commercial operations in November 2007. |
| Salient Features |
- Location - Chamba District, Himachal Pradesh
- Installed Capacity - 5 MW + 20% overload
- Type - Run-of-the-river
- Average Annual Output - 2.9 MU
- Gross Head - 180 M
- Date of Commercial Operation - November 2007
|
|
| (b) Balseo SHP (5MW) |
View Records |
Balseo SHP is going to start commercial production in September 2010. Located at a distance of 20 kms from Taraila SHP, it is the second hydro power project undertaken by the company. The construction activities are in advanced stages, and the company expects to commission on schedule. |
| Salient Features |
- Location - Chamba District, Himachal Pradesh
- Installed Capacity - 5 MW + 20% overload
- Type - Run-of-the-river
- Average Annual Output - 2.9 MU
- Gross Head - 180 M
- Date of Commercial Operation - September 2010
|
|
| Liquid Fuel |
|
|
| (a) Neemrana (6MW) |
The company operates a 6MW furnace oil generating set connected to the grid. The project is a peaking power station, operational during peak power load. |
| Salient Features |
- Fuel - Furnace Oil
- Capacity - 6 MW
|